A jacket cutting and a later piece are easier to discuss when composition, weave, shade and finish stay attached to the same reference.
Write the wool percentage and any companion fibre before the cloth is compared with another suiting of similar weight. Name the weave, such as plain, twill or herringbone, and say whether the face is milled, clear or still undecided. Add the garment: a structured jacket, a softer sport coat or a trouser cloth that must accept a crease. If a previous cutting exists, describe its colour family and the date it was reviewed. Leave unknown GSM, width and finish as open fields. A request for a cutting does not confirm that a particular piece is on hand or that a later delivery will match it.
Set the submitted cutting beside the brief and note what actually matches. Handle can diverge even when the declared fibre content looks alike, because yarn twist, sett and finishing change drape. Record whether the cutting has already been pressed, fused or only loom-state. If shade is the issue, keep the reference and the candidate under the same light and write the difference in plain language rather than a single pass or fail word. Width should be read as cuttable width, with selvedge called out separately so a pattern layout is not planned on the full cloth width.
Hold shade, handle and finish notes on one record so a later reader can see which property was accepted. A shade comment made on a small clipping should say whether it covers the piece, the lot or only that clipping. Finish approval should name the face that was seen: milled, clear-cut, or a treatment still under discussion. If pilling, seam slippage or colourfastness is part of the conversation, attach the method name, the specimen condition and the report date. Do not copy a result from a different construction onto this wool cloth because the weights look close.
When the cloth direction is clear enough to discuss quantity, separate the material target from the commercial context. State the approximate length or number of garments only as a discussion figure, plus the destination you need the conversation to consider. Ask which approval record should travel with that discussion. Timing, minimums and continuity across dye lots are questions for the reply, not figures this page can fill in. If two lots are being compared, ask for the shade band to be judged on cuttings from each lot rather than from a stored photo.
A service conversation stays usable when the material question, the sample question and the order question are written on separate lines. Composition, construction, GSM, usable width and finish describe the textile. Quantity, destination and requested timing describe the commercial request. A target requirement is not a reported result, and a page statement is not a batch approval.
| Request | Include | Keep separate |
|---|---|---|
| Sample discussion | Reference, colour direction and intended use | A screen image is not the approval standard |
| Specification question | Composition, construction, GSM, usable width and finish | An unknown value stays blank |
| Availability question | Material reference and the quantity under discussion | A catalogue page is not a delivery promise |
| Order context | Destination and the decision that still needs an answer | Do not merge it into the sample record |
Send the cutting reference, the garment use and the points that still need a reply.